﻿{"id":67618,"date":"2023-11-22T09:32:54","date_gmt":"2023-11-22T09:32:54","guid":{"rendered":"https:\/\/www.metrolisboa.pt\/en\/?p=67618"},"modified":"2023-12-11T12:38:17","modified_gmt":"2023-12-11T12:38:17","slug":"were-improving-accessibility-at-campo-pequeno-and-picoas-stations","status":"publish","type":"post","link":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/","title":{"rendered":"We&#8217;re improving accessibility at Campo Pequeno and Picoas stations"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.23&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row _builder_version=&#8221;4.23&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.23&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_text _builder_version=&#8221;4.23&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>Metropolitano de Lisboa has started the work of the contract for the &#8220;Interventions to Ensure Accessibility for People with Reduced Mobility at Campo Pequeno and Picoas Stations on the Yellow Line of Metropolitano de Lisboa, E.P.E&#8221;.<\/p>\n<p>Full accessibility at the Campo Pequeno (south atrium) and Picoas (north atrium) stations will be made possible by the completion of construction and installation of the necessary equipment to commission three lifts that will provide access between street level and each of the platforms at these stations.<\/p>\n<h1>Start of construction:<\/h1>\n<p>6 December 2023<\/p>\n<h1>Constraints for customers:<\/h1>\n<p>&#8211; Campo Pequeno station: while the work is being carried out, the west access to the station&#8217;s south atrium (exit Av. Rep\u00fablica \/ Av. 5 de Outubro) will be closed to the public, while the east access (exit Av. Repblica &#8211; east \/ Av. Barbosa du Bocage &#8211; east) will remain open, ensuring the operation of that atrium.<\/p>\n<p>The south atrium will be closed in its entirety for building works for approximately 10 days (to be announced).<\/p>\n<p>&#8211; Picoas Station: while the work is being carried out, the accesses to the north atrium of the station (R. Tom\u00e1s Ribeiro \/ Av. Fontes Pereira de Melo) will remain in operation, however, in order to install the atrium\/platform lifts, the pedestrian stairs located next to the station&#8217;s exterior wall on each platform will be closed.<\/p>\n<h1>General information<\/h1>\n<p>Company: External Consortium CARI CONSTRUTORES S.A.\/ EFACEC ENGENHARIA E SISTEMAS, S.A.,<\/p>\n<p>Total investment: 2 987 202.16 \u20ac (contract value)<\/p>\n<p>Campo Pequeno: 1 712 458.20 \u20ac<\/p>\n<p>Picoas: 1 274 743.96 \u20ac<\/p>\n<h1>Estimated completion date:<\/h1>\n<p>July 2024.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Metropolitano de Lisboa has started the work of the contract for the &#8220;Interventions to Ensure Accessibility for People with Reduced Mobility at Campo Pequeno and Picoas Stations on the Yellow Line of Metropolitano de Lisboa, E.P.E&#8221;. Full accessibility at the Campo Pequeno (south atrium) and Picoas (north atrium) stations will be made possible by the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":68154,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-67618","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sem-categoria"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>We&#039;re improving accessibility at Campo Pequeno and Picoas stations - Metropolitano de Lisboa, EPE - English<\/title>\n<meta name=\"description\" content=\"Metropolitano de Lisboa is about to begin the work of the contract for the &quot;Interventions to Ensure Accessibility for People with Reduced Mobility at Campo Pequeno and Picoas Stations on the Yellow Line of Metropolitano de Lisboa, E.P.E&quot;.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"We&#039;re improving accessibility at Campo Pequeno and Picoas stations - Metropolitano de Lisboa, EPE - English\" \/>\n<meta property=\"og:description\" content=\"Metropolitano de Lisboa is about to begin the work of the contract for the &quot;Interventions to Ensure Accessibility for People with Reduced Mobility at Campo Pequeno and Picoas Stations on the Yellow Line of Metropolitano de Lisboa, E.P.E&quot;.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/\" \/>\n<meta property=\"og:site_name\" content=\"Metropolitano de Lisboa, EPE - English\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-22T09:32:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-12-11T12:38:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2023\/11\/botoes-elevadores_CP_PI_1080x450_UK.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"450\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"rpereira\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rpereira\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/\"},\"author\":{\"name\":\"rpereira\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/#\\\/schema\\\/person\\\/3b5d6f84fa1b68dfc9ce4b5500813bb2\"},\"headline\":\"We&#8217;re improving accessibility at Campo Pequeno and Picoas stations\",\"datePublished\":\"2023-11-22T09:32:54+00:00\",\"dateModified\":\"2023-12-11T12:38:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/\"},\"wordCount\":317,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2023\\\/11\\\/botoes-elevadores_CP_PI_1080x450_UK.png\",\"articleSection\":[\"Sem categoria\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/\",\"url\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/\",\"name\":\"We're improving accessibility at Campo Pequeno and Picoas stations - Metropolitano de Lisboa, EPE - English\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2023\\\/11\\\/botoes-elevadores_CP_PI_1080x450_UK.png\",\"datePublished\":\"2023-11-22T09:32:54+00:00\",\"dateModified\":\"2023-12-11T12:38:17+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/#\\\/schema\\\/person\\\/3b5d6f84fa1b68dfc9ce4b5500813bb2\"},\"description\":\"Metropolitano de Lisboa is about to begin the work of the contract for the \\\"Interventions to Ensure Accessibility for People with Reduced Mobility at Campo Pequeno and Picoas Stations on the Yellow Line of Metropolitano de Lisboa, E.P.E\\\".\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2023\\\/11\\\/botoes-elevadores_CP_PI_1080x450_UK.png\",\"contentUrl\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2023\\\/11\\\/botoes-elevadores_CP_PI_1080x450_UK.png\",\"width\":1080,\"height\":450},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2023\\\/11\\\/22\\\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"We&#8217;re improving accessibility at Campo Pequeno and Picoas stations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/\",\"name\":\"Metropolitano de Lisboa, EPE - English\",\"description\":\"Mais um site Sites de Metropolitano de Lisboa, E.P.E.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/#\\\/schema\\\/person\\\/3b5d6f84fa1b68dfc9ce4b5500813bb2\",\"name\":\"rpereira\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/be3ea32a22fb75d07eae2f99404de84b38afd81d1ab5ee7d834af377229079bf?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/be3ea32a22fb75d07eae2f99404de84b38afd81d1ab5ee7d834af377229079bf?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/be3ea32a22fb75d07eae2f99404de84b38afd81d1ab5ee7d834af377229079bf?s=96&d=mm&r=g\",\"caption\":\"rpereira\"},\"url\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/author\\\/rpereira\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"We're improving accessibility at Campo Pequeno and Picoas stations - Metropolitano de Lisboa, EPE - English","description":"Metropolitano de Lisboa is about to begin the work of the contract for the \"Interventions to Ensure Accessibility for People with Reduced Mobility at Campo Pequeno and Picoas Stations on the Yellow Line of Metropolitano de Lisboa, E.P.E\".","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/","og_locale":"en_US","og_type":"article","og_title":"We're improving accessibility at Campo Pequeno and Picoas stations - Metropolitano de Lisboa, EPE - English","og_description":"Metropolitano de Lisboa is about to begin the work of the contract for the \"Interventions to Ensure Accessibility for People with Reduced Mobility at Campo Pequeno and Picoas Stations on the Yellow Line of Metropolitano de Lisboa, E.P.E\".","og_url":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/","og_site_name":"Metropolitano de Lisboa, EPE - English","article_published_time":"2023-11-22T09:32:54+00:00","article_modified_time":"2023-12-11T12:38:17+00:00","og_image":[{"width":1080,"height":450,"url":"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2023\/11\/botoes-elevadores_CP_PI_1080x450_UK.png","type":"image\/png"}],"author":"rpereira","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rpereira","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/#article","isPartOf":{"@id":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/"},"author":{"name":"rpereira","@id":"https:\/\/www.metrolisboa.pt\/en\/#\/schema\/person\/3b5d6f84fa1b68dfc9ce4b5500813bb2"},"headline":"We&#8217;re improving accessibility at Campo Pequeno and Picoas stations","datePublished":"2023-11-22T09:32:54+00:00","dateModified":"2023-12-11T12:38:17+00:00","mainEntityOfPage":{"@id":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/"},"wordCount":317,"commentCount":0,"image":{"@id":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/#primaryimage"},"thumbnailUrl":"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2023\/11\/botoes-elevadores_CP_PI_1080x450_UK.png","articleSection":["Sem categoria"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/","url":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/","name":"We're improving accessibility at Campo Pequeno and Picoas stations - Metropolitano de Lisboa, EPE - English","isPartOf":{"@id":"https:\/\/www.metrolisboa.pt\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/#primaryimage"},"image":{"@id":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/#primaryimage"},"thumbnailUrl":"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2023\/11\/botoes-elevadores_CP_PI_1080x450_UK.png","datePublished":"2023-11-22T09:32:54+00:00","dateModified":"2023-12-11T12:38:17+00:00","author":{"@id":"https:\/\/www.metrolisboa.pt\/en\/#\/schema\/person\/3b5d6f84fa1b68dfc9ce4b5500813bb2"},"description":"Metropolitano de Lisboa is about to begin the work of the contract for the \"Interventions to Ensure Accessibility for People with Reduced Mobility at Campo Pequeno and Picoas Stations on the Yellow Line of Metropolitano de Lisboa, E.P.E\".","breadcrumb":{"@id":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/#primaryimage","url":"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2023\/11\/botoes-elevadores_CP_PI_1080x450_UK.png","contentUrl":"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2023\/11\/botoes-elevadores_CP_PI_1080x450_UK.png","width":1080,"height":450},{"@type":"BreadcrumbList","@id":"https:\/\/www.metrolisboa.pt\/en\/2023\/11\/22\/were-improving-accessibility-at-campo-pequeno-and-picoas-stations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/www.metrolisboa.pt\/en\/"},{"@type":"ListItem","position":2,"name":"We&#8217;re improving accessibility at Campo Pequeno and Picoas stations"}]},{"@type":"WebSite","@id":"https:\/\/www.metrolisboa.pt\/en\/#website","url":"https:\/\/www.metrolisboa.pt\/en\/","name":"Metropolitano de Lisboa, EPE - English","description":"Mais um site Sites de Metropolitano de Lisboa, E.P.E.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.metrolisboa.pt\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.metrolisboa.pt\/en\/#\/schema\/person\/3b5d6f84fa1b68dfc9ce4b5500813bb2","name":"rpereira","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/be3ea32a22fb75d07eae2f99404de84b38afd81d1ab5ee7d834af377229079bf?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/be3ea32a22fb75d07eae2f99404de84b38afd81d1ab5ee7d834af377229079bf?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/be3ea32a22fb75d07eae2f99404de84b38afd81d1ab5ee7d834af377229079bf?s=96&d=mm&r=g","caption":"rpereira"},"url":"https:\/\/www.metrolisboa.pt\/en\/author\/rpereira\/"}]}},"jetpack_featured_media_url":"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2023\/11\/botoes-elevadores_CP_PI_1080x450_UK.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/posts\/67618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/comments?post=67618"}],"version-history":[{"count":6,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/posts\/67618\/revisions"}],"predecessor-version":[{"id":68202,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/posts\/67618\/revisions\/68202"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/media\/68154"}],"wp:attachment":[{"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/media?parent=67618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/categories?post=67618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/tags?post=67618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}