﻿{"id":70910,"date":"2026-04-24T08:09:33","date_gmt":"2026-04-24T08:09:33","guid":{"rendered":"https:\/\/www.metrolisboa.pt\/en\/?p=70910"},"modified":"2026-04-27T15:52:18","modified_gmt":"2026-04-27T15:52:18","slug":"temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5","status":"publish","type":"post","link":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/","title":{"rendered":"Temporary closure of the Rossio\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5"},"content":{"rendered":"<p>Due to construction works for the future Circle Line, the section between Rossio and Cais do Sodr\u00e9 on the Green Line will be closed from 2 May (Saturday) to 5 May (Tuesday).<\/p>\n<p>During this period, the following stations will be closed: Rossio, Baixa-Chiado and Cais do Sodr\u00e9.<\/p>\n<p>Green Line services will operate only between Telheiras &#8211; Martim Moniz \u2013 Telheiras.<\/p>\n<p>Customers are advised to use CARRIS services as an alternative, namely:<\/p>\n<p>Martim Moniz \u00bb Cais do Sodr\u00e9<br \/>\n208 (Midnight Network)<br \/>\n760<\/p>\n<p>Pra\u00e7a da Figueira \u00bb Cais do Sodr\u00e9<br \/>\n774 (night and weekend)<br \/>\n15E<br \/>\n25E<\/p>\n<p>Rossio \u00bb Cais do Sodr\u00e9<br \/>\n207 (Midnight Network)<br \/>\n732<br \/>\n736 (night service)<\/p>\n<p>Baixa\u2011Chiado station on the Blue Line will remain open and operating as usual.<\/p>\n<p>This temporary service change is necessary to carry out essential track works, ensuring the compatibility between the current infrastructure and the future operation of the network.<\/p>\n<p>The intervention is part of the contract \u201cLot 4: Design and Construction of Finishes and Systems for the Rato\u2013Cais do Sodr\u00e9 Extension\u201d, within the project to extend the Yellow and Green Lines.<\/p>\n<p>We apologise for any inconvenience caused and thank you for your understanding.<\/p>\n<p>More information: <a href=\"https:\/\/projetos.metrolisboa.pt\/\">https:\/\/projetos.metrolisboa.pt\/<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Due to construction works for the future Circle Line, the section between Rossio and Cais do Sodr\u00e9 on the Green Line will be closed from 2 May (Saturday) to 5 May (Tuesday). During this period, the following stations will be closed: Rossio, Baixa-Chiado and Cais do Sodr\u00e9. Green Line services will operate only between Telheiras [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":70917,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[11,46],"tags":[],"class_list":["post-70910","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-atuais","category-noticias-em-destaque"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Temporary closure of the Rossio\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5 - Metropolitano de Lisboa, EPE - English<\/title>\n<meta name=\"description\" content=\"Due to construction works for the future Circle Line, the section between Rossio and Cais do Sodr\u00e9 on the Green Line will be closed from 2 May (Saturday) to 5 May (Tuesday).\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Temporary closure of the Rossio\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5\" \/>\n<meta property=\"og:description\" content=\"Due to construction works for the future Circle Line, the section between Rossio and Cais do Sodr\u00e9 on the Green Line will be closed from 2 May (Saturday) to 5 May (Tuesday).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/\" \/>\n<meta property=\"og:site_name\" content=\"Metropolitano de Lisboa, EPE - English\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-24T08:09:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-27T15:52:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/Encerramento_2_5_maio_UK_Noticia-1080x450-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"450\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"atac\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Temporary closure of the Rossio\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5\" \/>\n<meta name=\"twitter:description\" content=\"Due to construction works for the future Circle Line, the section between Rossio and Cais do Sodr\u00e9 on the Green Line will be closed from 2 May (Saturday) to 5 May (Tuesday).\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"atac\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/\"},\"author\":{\"name\":\"atac\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/#\\\/schema\\\/person\\\/344190d46d5df4e03e6c6b169ed96517\"},\"headline\":\"Temporary closure of the Rossio\\\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5\",\"datePublished\":\"2026-04-24T08:09:33+00:00\",\"dateModified\":\"2026-04-27T15:52:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/\"},\"wordCount\":201,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2026\\\/04\\\/Encerramento_2_5_maio_UK_Noticia-1080x450-1.png\",\"articleSection\":[\"Not\u00edcias atuais\",\"Not\u00edcias em destaque\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/\",\"url\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/\",\"name\":\"Temporary closure of the Rossio\\\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5 - Metropolitano de Lisboa, EPE - English\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2026\\\/04\\\/Encerramento_2_5_maio_UK_Noticia-1080x450-1.png\",\"datePublished\":\"2026-04-24T08:09:33+00:00\",\"dateModified\":\"2026-04-27T15:52:18+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/#\\\/schema\\\/person\\\/344190d46d5df4e03e6c6b169ed96517\"},\"description\":\"Due to construction works for the future Circle Line, the section between Rossio and Cais do Sodr\u00e9 on the Green Line will be closed from 2 May (Saturday) to 5 May (Tuesday).\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2026\\\/04\\\/Encerramento_2_5_maio_UK_Noticia-1080x450-1.png\",\"contentUrl\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2026\\\/04\\\/Encerramento_2_5_maio_UK_Noticia-1080x450-1.png\",\"width\":1080,\"height\":450},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/2026\\\/04\\\/24\\\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Temporary closure of the Rossio\\\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/\",\"name\":\"Metropolitano de Lisboa, EPE - English\",\"description\":\"Mais um site Sites de Metropolitano de Lisboa, E.P.E.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/#\\\/schema\\\/person\\\/344190d46d5df4e03e6c6b169ed96517\",\"name\":\"atac\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6da3d566bf9fb5d08395a97258a6ecd8c17c32c47d6538a90ce56b4937379229?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6da3d566bf9fb5d08395a97258a6ecd8c17c32c47d6538a90ce56b4937379229?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6da3d566bf9fb5d08395a97258a6ecd8c17c32c47d6538a90ce56b4937379229?s=96&d=mm&r=g\",\"caption\":\"atac\"},\"url\":\"https:\\\/\\\/www.metrolisboa.pt\\\/en\\\/author\\\/atac\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Temporary closure of the Rossio\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5 - Metropolitano de Lisboa, EPE - English","description":"Due to construction works for the future Circle Line, the section between Rossio and Cais do Sodr\u00e9 on the Green Line will be closed from 2 May (Saturday) to 5 May (Tuesday).","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/","og_locale":"en_US","og_type":"article","og_title":"Temporary closure of the Rossio\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5","og_description":"Due to construction works for the future Circle Line, the section between Rossio and Cais do Sodr\u00e9 on the Green Line will be closed from 2 May (Saturday) to 5 May (Tuesday).","og_url":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/","og_site_name":"Metropolitano de Lisboa, EPE - English","article_published_time":"2026-04-24T08:09:33+00:00","article_modified_time":"2026-04-27T15:52:18+00:00","og_image":[{"width":1080,"height":450,"url":"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/Encerramento_2_5_maio_UK_Noticia-1080x450-1.png","type":"image\/png"}],"author":"atac","twitter_card":"summary_large_image","twitter_title":"Temporary closure of the Rossio\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5","twitter_description":"Due to construction works for the future Circle Line, the section between Rossio and Cais do Sodr\u00e9 on the Green Line will be closed from 2 May (Saturday) to 5 May (Tuesday).","twitter_misc":{"Written by":"atac","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/#article","isPartOf":{"@id":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/"},"author":{"name":"atac","@id":"https:\/\/www.metrolisboa.pt\/en\/#\/schema\/person\/344190d46d5df4e03e6c6b169ed96517"},"headline":"Temporary closure of the Rossio\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5","datePublished":"2026-04-24T08:09:33+00:00","dateModified":"2026-04-27T15:52:18+00:00","mainEntityOfPage":{"@id":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/"},"wordCount":201,"commentCount":0,"image":{"@id":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/#primaryimage"},"thumbnailUrl":"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/Encerramento_2_5_maio_UK_Noticia-1080x450-1.png","articleSection":["Not\u00edcias atuais","Not\u00edcias em destaque"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/","url":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/","name":"Temporary closure of the Rossio\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5 - Metropolitano de Lisboa, EPE - English","isPartOf":{"@id":"https:\/\/www.metrolisboa.pt\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/#primaryimage"},"image":{"@id":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/#primaryimage"},"thumbnailUrl":"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/Encerramento_2_5_maio_UK_Noticia-1080x450-1.png","datePublished":"2026-04-24T08:09:33+00:00","dateModified":"2026-04-27T15:52:18+00:00","author":{"@id":"https:\/\/www.metrolisboa.pt\/en\/#\/schema\/person\/344190d46d5df4e03e6c6b169ed96517"},"description":"Due to construction works for the future Circle Line, the section between Rossio and Cais do Sodr\u00e9 on the Green Line will be closed from 2 May (Saturday) to 5 May (Tuesday).","breadcrumb":{"@id":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/#primaryimage","url":"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/Encerramento_2_5_maio_UK_Noticia-1080x450-1.png","contentUrl":"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/Encerramento_2_5_maio_UK_Noticia-1080x450-1.png","width":1080,"height":450},{"@type":"BreadcrumbList","@id":"https:\/\/www.metrolisboa.pt\/en\/2026\/04\/24\/temporary-closure-of-the-rossio-cais-do-sodre-section-green-line-from-may-2-to-may-5\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/www.metrolisboa.pt\/en\/"},{"@type":"ListItem","position":2,"name":"Temporary closure of the Rossio\/Cais do Sodr\u00e9 section (Green Line) from May 2 to May 5"}]},{"@type":"WebSite","@id":"https:\/\/www.metrolisboa.pt\/en\/#website","url":"https:\/\/www.metrolisboa.pt\/en\/","name":"Metropolitano de Lisboa, EPE - English","description":"Mais um site Sites de Metropolitano de Lisboa, E.P.E.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.metrolisboa.pt\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.metrolisboa.pt\/en\/#\/schema\/person\/344190d46d5df4e03e6c6b169ed96517","name":"atac","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/6da3d566bf9fb5d08395a97258a6ecd8c17c32c47d6538a90ce56b4937379229?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6da3d566bf9fb5d08395a97258a6ecd8c17c32c47d6538a90ce56b4937379229?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6da3d566bf9fb5d08395a97258a6ecd8c17c32c47d6538a90ce56b4937379229?s=96&d=mm&r=g","caption":"atac"},"url":"https:\/\/www.metrolisboa.pt\/en\/author\/atac\/"}]}},"jetpack_featured_media_url":"https:\/\/www.metrolisboa.pt\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/Encerramento_2_5_maio_UK_Noticia-1080x450-1.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/posts\/70910","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/comments?post=70910"}],"version-history":[{"count":3,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/posts\/70910\/revisions"}],"predecessor-version":[{"id":70916,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/posts\/70910\/revisions\/70916"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/media\/70917"}],"wp:attachment":[{"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/media?parent=70910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/categories?post=70910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.metrolisboa.pt\/en\/wp-json\/wp\/v2\/tags?post=70910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}